Supplier Vetting
Is this company what it claims to be?
Corporate records, export history, ownership and references, checked before anyone gets on a plane.
Method
No two buyers arrive the same way. Some come to stop a mistake and some come to find something worth making, and the work splits along that line. What does not change is how a factory is checked before we put its name in front of you, and that everything we conclude is written down.

What never changes
Everything else is scope. These three are not.
A name reaches your shortlist after it has been checked, not before. If we have not established that a factory can do what it says, we say so rather than passing the claim along.
Findings are delivered as written records you keep, not as reassurance on a call. A decision you cannot show to your own finance and compliance teams is not a decision we have finished.
Our fee is agreed with you by scope. We hold no commission from any manufacturer, which is what allows a shortlist to be short.
The other half
Verification answers only one kind of question. A buyer who already trusts the factory still has to decide what to make, and some clients buy only this half.
Who is making work your market has not seen?
Studios, independent designers and the makers behind them, found by looking rather than by searching a directory. Brazil's authorship is not concentrated in one place and very little of it is exported.
Does this hold together as a collection, or is it a list of pieces?
Price architecture, material coherence, the gaps a range needs to fill and the pieces that are carrying nothing. Specifying a range is a different discipline from buying one.
What has to change for this to work where you sell?
Dimensions, materials, finishes, packing and compliance read against the destination rather than against the Brazilian domestic market the piece was designed for.
Whose design is it, and on what terms can you make it?
Authorship, exclusivity and the commercial structure between you, the designer and the manufacturer, settled before tooling is paid for rather than after.

What never changes
No factory is recommended before it has been verified.
Scope
A hospitality programme in the Gulf and a retail category in New York need different halves of the same standard. The scope is written after we understand which.
You know the product and the customer. You do not yet know which Brazilian pole makes it well, or which plant inside that pole. Weight falls on vetting and qualification.
The origin is decided and the relationship exists, but volume, quality or lead time has hit a ceiling. Weight falls on production intelligence and quality validation.
A contract, an opening date or a season is committed. Weight falls on export readiness, commercial alignment and the schedule.
You are building a range around Brazilian authored design. The supplier is a studio of five people, the constraint is capacity rather than price, and the reading happens in the room. That is Design Scouting.
Limits
Stated plainly, because a method that claims everything proves nothing.

Next step
A diagnostic call, then a scoped proposal. No obligation on either side.